YUN APPARELCUSTOM SOCK DEVELOPMENT
SearchShortlistStart a Project
guide

Sample Approval Checklist

Approve an identified physical sample against a written brief. Keep visual direction, sample evaluation and production approval as separate decisions.

Know which sample you are reviewing

A mockup illustrates visual direction. An existing reference sample helps discuss construction. A custom development sample represents the agreed changes for review. Confirm which sample is being supplied and what it does and does not demonstrate.

Check the sample against the brief

Use the agreed measurement points and acceptance criteria for this project. Keep model-specific test requirements separate from appearance approval.

  • Construction, composition information, measurements, sizing and intended fit.
  • Logo method, dimensions, placement, colour reference and artwork revision.
  • Internal and external grip placement, intended-use observations and any agreed wash evaluation.
  • Packaging, labels, identification and quantity assortment.

Record acceptance and unresolved changes

Keep a dated record with the sample reference, revision, reviewer, accepted items, requested changes and approval scope. A change to a material, grip, size or artwork may need a new sample or further checks.

  • Retain the approved sample and documents as the baseline for the order.
  • For a reorder, state whether the previous version remains applicable and identify any changes.

Keep appearance, fit and performance approvals separate

Accepting artwork does not approve an unmeasured dimension or an untested performance claim. Record the scope of each decision and retain unresolved items.

Keep appearance, fit and performance approvals separate
Approval scopeVerifyKeep
AppearanceColour, logo, sole layout, left / right orientationActual-size artwork and sample photographs
Dimensions and fitMeasurement points, units, sample condition and tolerancesMeasured values and wearer / size context
Use and careContact surface, activity and agreed washing procedureObservations and any applicable test report
PackagingLabel text, barcode inputs, size / colour identity and packingApproved packed sample
ReleaseAccepted items, changes, owner and dated versionWritten approval scope; unresolved items remain open

Buying questions answered here

Q20 · Brand quality and procurement teams

What should we check and sign off before approving bulk production?

Check the sample reference and revision, dimensions, fit, composition, inner and outer grip layout, logo, colours and packaging against the agreed brief. Record actual observations, agreed tolerances, open points and the person approving each item. A mockup or unsigned checklist is not approval to begin bulk production.

Key considerations: Measurements, feel, artwork, construction, wash review, packaging and open points.

← Back to all questions

Related articles

Related references

Continue your buying journey

Chat on WhatsApp